Große Auswahl an günstigen Büchern
Schnelle Lieferung per Post und DHL

Methodology for manufacturing of Harbour structures (Volume III)

Methodology for manufacturing of Harbour structures (Volume III)von Houssam Khelalfa Sie sparen 19% des UVP sparen 19%
Über Methodology for manufacturing of Harbour structures (Volume III)

The purpose of this book is to present step-by-step requirements and methodology for the fabrication of port and marine structures with details to build high quality vertical breakwaters (caissons) in accordance with project specifications, applicable codes and standards. In this third part (Volume III); We started with Directive and Recommendations for marine construction works. Then we presented with details how to do and apply the Methods of Construction of Vertical Breakwaters (Caissons), such as; Construction on Floating Dock, the JARLAN Caisson and Protection Vertical Dykes. After, we present with details how to make and apply the Slip form Construction, such as; Installation of gantry house and sliding formwork systems For the production of caissons, and Methodology of manufacture of the caisson (vertical Breakwaters) by Slip form. Then we presented with details how to do and apply the methods of repairing the caissons. Finally; we present with details how to make and apply the Methodologies of realization of the main elements and works of a port.

Mehr anzeigen
  • Sprache:
  • Englisch
  • ISBN:
  • 9786139460854
  • Einband:
  • Taschenbuch
  • Seitenzahl:
  • 480
  • Veröffentlicht:
  • 13. März 2019
  • Abmessungen:
  • 150x29x220 mm.
  • Gewicht:
  • 733 g.
  Versandkostenfrei
  Versandfertig in 1-2 Wochen.
Verlängerte Rückgabefrist bis 31. Januar 2025

Beschreibung von Methodology for manufacturing of Harbour structures (Volume III)

The purpose of this book is to present step-by-step requirements and methodology for the fabrication of port and marine structures with details to build high quality vertical breakwaters (caissons) in accordance with project specifications, applicable codes and standards. In this third part (Volume III); We started with Directive and Recommendations for marine construction works. Then we presented with details how to do and apply the Methods of Construction of Vertical Breakwaters (Caissons), such as; Construction on Floating Dock, the JARLAN Caisson and Protection Vertical Dykes. After, we present with details how to make and apply the Slip form Construction, such as; Installation of gantry house and sliding formwork systems For the production of caissons, and Methodology of manufacture of the caisson (vertical Breakwaters) by Slip form. Then we presented with details how to do and apply the methods of repairing the caissons. Finally; we present with details how to make and apply the Methodologies of realization of the main elements and works of a port.

Kund*innenbewertungen von Methodology for manufacturing of Harbour structures (Volume III)



Willkommen bei den Tales Buchfreunden und -freundinnen

Jetzt zum Newsletter anmelden und tolle Angebote und Anregungen für Ihre nächste Lektüre erhalten.